1. BP Clair phase 1–Pile driveability and capacity in extremely hard till;Aldridge;Front. Offshore Geotech,2010
2. Soil model for pile driveability based on CPT interpretations;Alm,2001
3. API RP2A-WSD, Recommended Practice for Planning, Designing, and Constructing Fixed Offshore Platforms–working Stress Design;API,2007
4. Design of monopiles for offshore wind turbines in 10 steps;Arany;Soil Dynam. Earthq. Eng.,2017
5. Comparison of pile driveability methods in North sea sand;Byrne,2012