1. APR1400 Desing Control Document Tier 2. Chapter 7: Instrumentation and Controls, Korea Electric Power Corporation; , Korea Hydro & Nuclear Power Co., Ltd;, South Korea, 2018.
2. Lessons learned from the U.S. nuclear regulatory commission’s digital system risk research;Arndt;Nucl. Technol.,2010
3. Software Reliability Analysis for PSA: Failure Mode and Data Analysis;Backstrom,2015
4. An Integrated Risk Assessment Process for Digital Instrumentation and Control Upgrades of Nuclear Power Plants;Bao,2019
5. Review of Quantitative Software Reliability Methods;Chu,2010