Author:
Hammad Ahmed WA.,Akbarnezhad Ali,Wu Peng,Wang Xiangyu,Haddad Assed
Subject
Industrial and Manufacturing Engineering,Strategy and Management,General Environmental Science,Renewable Energy, Sustainability and the Environment
Reference70 articles.
1. Causes of delay in building construction projects in Egypt;Abd El-Razek;J. Constr. Eng. Manag.,2008
2. COMMERCIAL BUILDING DISCLOSURE;Acil Allen Consulting,2015
3. Building Envelope;Advanced Buildings,2010
4. Estimation and minimization of embodied carbon of buildings: a review;Akbarnezhad;Buildings,2017
5. Sustainable Facades: Design Methods for High-Performance Building Envelopes;Aksamija,2013
Cited by
77 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献