Author:
Akbar Muhammad,Irohara Takashi
Funder
Hitachi Global Foundation
Japan Student Services Organization
Subject
Industrial and Manufacturing Engineering,Strategy and Management,General Environmental Science,Renewable Energy, Sustainability and the Environment
Reference86 articles.
1. Lot sizing with carbon emission constraints;Absi;Eur. J. Oper. Res.,2013
2. Effective scheduling of a large-scale paint production system;Adonyi;J. Clean. Prod.,2008
3. Dual resource constrained scheduling considering operator working modes and moving in identical parallel machines using a permutation-based genetic algorithm;Akbar,2018
4. Key performance indicators for sustainable manufacturing evaluation in cement industry;Amrina;Procedia CIRP,2015
5. The energy scheduling problem: industrial case-study and constraint propagation techniques;Artigues;Int. J. Prod. Econ.,2013
Cited by
127 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献