Author:
Artigues Christian,Lopez Pierre,Haït Alain
Subject
Industrial and Manufacturing Engineering,Management Science and Operations Research,Economics and Econometrics,General Business, Management and Accounting
Reference25 articles.
1. Baptiste, Ph., Jouglet, A., Le Pape, C., Nuijten, W., 2000. A constraint-based approach to minimize the weighted number of late jobs on parallel machines. UTC Technical Report 2000/288, 288.
2. Satisfiability tests and time-bound adjustments for cumulative scheduling problems;Baptiste;Annals of Operations Research,1999
3. Blazewicz, J., Machowiak, M., Weglarz, J., Kovalyov, M.Y., Trystram, D., 2004. Scheduling malleable tasks on parallel processors to minimize the makespan. In: Baptiste, Ph., Carlier, J., Munier, A., Schulz, A.S. (Eds.), Models and Algorithms for Planning and Scheduling Problems, Annals of Operations Research, vol. 129(1–4), pp. 65–80.
4. Hierarchical approach to steel production scheduling under a global energy constraint;Boukas;Annals of Operations Research,1990
5. Solving parallel machine scheduling problems by column generation;Chen;INFORMS Journal on Computing,1999
Cited by
74 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献