A comparison between the VERT program and other methods of project duration estimation
Author:
Publisher
Elsevier BV
Subject
Information Systems and Management,Management Science and Operations Research,Strategy and Management
Reference11 articles.
1. A multivariate approach to estimating the completion time for PERT networks;Anklesaria;J. opl Res. Soc.,1986
2. Estimating a project's completion time distribution using intelligent simulation methods;Cook;J. opl Res. Soc.,1979
3. A framework for evaluating network planning and control techniques;Digman;Res. Mgmt,1981
4. Normally distributed activity durations in PERT networks;Kamburowski;J. opl Res. Soc.,1985
5. Erratum: Normally Distributed Activity Durations in PERT Networks
Cited by 18 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Automated Productivity-Based Schedule Animation: Simulation-Based Approach to Time-Cost Trade-Off Analysis;Journal of Construction Engineering and Management;2014-04
2. Productividad Automatizada Basada en el Itinerario Animado (APBSA): Una Simulacion Basada en un Enfoque del Analisis de Compensacion Tiempo-Costo;Journal of Construction Engineering and Management;2014-04
3. Resource constrained scheduling simulation model for alternative stochastic network projects;Mathematics and Computers in Simulation;2003-06
4. Stochastic Construction Time-Cost Trade-Off Analysis;Journal of Computing in Civil Engineering;2000-04
5. Towards realism in network simulation;Omega;1999-06
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3