Productividad Automatizada Basada en el Itinerario Animado (APBSA): Una Simulacion Basada en un Enfoque del Analisis de Compensacion Tiempo-Costo

Author:

Gelisen Gokhan1,Griffis F. H. (Bud)2

Affiliation:

1. Gerente de Costos, Skanska USA Civil Northeast, Inc., 5214 39th Ave. Unit 2C, Queens, NY 11377 (corresponding author).

2. Profesor de Ingeniería Civil, Centro de Tecnología de Gestión de la Construcción, Rogers Hall 407, Polytechnic Institute of NYU, Brooklyn, NY 11201.

Publisher

American Society of Civil Engineers (ASCE)

Subject

Strategy and Management,Industrial relations,Building and Construction,Civil and Structural Engineering

Reference56 articles.

1. @RISK . (2004). Risk Analysis Add-in for Microsoft Excel (Version 4.5.3) Palisade Corporation Ithaca New York.

2. Network decomposition-based benchmark results for the discrete time–cost tradeoff problem

3. Analysis of activity network under uncertainty;Ang A.;J. Eng. Mech.,1975

4. Bennett P. D. and Thomas H. R. (1990). “A case study of the validity of daily crew-based productivity measurements.” M.S. thesis Pennsylvania State Univ. University Park PA [cited by Lee (2007)].

5. Bilal S. and Thomas H. R. (1990). “A comparative analysis of labor productivity of masons in seven countries.” PTI Rep. No. 9036 Pennsylvania State Univ. University Park PA [cited by Lee (2007)].

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3