1. Railway signal,2015
2. Start of using ATACS level crossing control function;Yamazaki;JREA,2015
3. Notification of “ATP Block system” test completion;Nakamura;Kyosan Circular,2015
4. Onboard measurement method for signaling equipment on Probe Train;Nakamura,2006
5. Nakamura H. Advances in signalling systems and the outlook for next-generation train control systems in Japan [presentation]. In: 3rd Asia-Pacific Control Command and Signalling (CCS) Workshop; 2014 Oct 22-23; Tokyo, Japan. 2014.