1. Construction of superconducting magnet system for the J-PARC neutrino beam line;Nakamoto;IEEE Trans Appl Supercond,2010
2. Cryogenics system for J-PARC neutrino superconducting magnet beam line – design, construction and performance test;Makida;Adv Cryo Eng,2010
3. Milner S, Technical requirements for the LHC quench relief valve, LHC technical note: MT-ESM/94-2; 1994.
4. Cold hard fact: no Tevatron without cryogenic system;Perricone;Fermi News,2003
5. Initial performance of upgrade Tevatron cryogenic system;Norris;Adv Cryo Eng,1996