Author:
Love Peter E.D.,Zhou Jingyang,Edwards David J.,Irani Zahir,Sing Chun-Pong
Funder
Australian Research Council
Subject
Management Science and Operations Research,Transportation,Civil and Structural Engineering
Reference64 articles.
1. Determining significant risks in the variability between design stage elemental cost plan and the final tender sum;Adafin;ASCE J. Manage. Eng.,2016
2. Evaluating the budgetary reliability of design stage elemental cost plan in building procurement;Adafin,2016
3. Statistical characteristics of contingency in water infrastructure projects;Baccarini;ASCE J. Construct. Eng. Manage.,2014
4. Bordat, C.B., McCulloch, K.C., Sinha, K.C., Labi, S., 2004. An Analysis of Cost Overruns and Time Delays of INDOT Projects, Publication FHWA/IN/TRP-2007.04. Joint Transportation Research Program, Indiana Department of Transportation and Purdue University, West Lafayette, Indiana. doi:http://dx.doi.org/10.573/1288284313134.
5. Characteristics of cost overruns for Dutch transport infrastructure projects and the importance of the decision to build and project phases;van Cantarelli;Transport Policy,2012
Cited by
54 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献