1. Baptiste, P. (1994). Constraint-based scheduling: two extensions. Master's Thesis, Glasgow. University of Strathclyde.
2. An O(n4) algorithm for preemptive scheduling of a single machine to minimize the number of late jobs;Baptiste;Operations Research Letters,1999
3. Baptiste, P., & Pape, C. L. (1996). A constraint-based branch and bound algorithm for pre-emptive job-shop scheduling, ILOG Technical Paper. ILOG Co. Ltd
4. Preemptive multi-processor task scheduling with release times and time windows;Bianco;Annals of Operation Research,1997
5. Hybrid genetic algorithms for a multiple-objective scheduling problem;Cavalieri;Journal of Intelligent Manufacturing,1997