Author:
Kim Taedong,Choi Byoung K.
Subject
Hardware and Architecture,Modeling and Simulation,Software
Reference22 articles.
1. Edward F. Watson, Deborah J. Medeiros, Randall P. Sadowski, Generating component release plans with backward simulation, in: Proceedings of the 1993 Winter Simulation Conference, 1993, pp. 930–938.
2. Sanjay Jain Stephen Chan, Experiences with backward simulation based approach for lot release planning, in: Proceedings of the 1997 Winter Simulation Conference, 1997, pp. 773–780.
3. An optimization-oriented method for simulation-based job shop scheduling incorporating capacity adjustment function;Arakawa;International Journal of Production Economics,2003
4. Lot release times and dispatching rule for a TFT-LCD cell process;Lin;Robotics and Computer-Integrated Manufacturing,2008
5. Stuart J. Russell, Peter Norvig, Artificial Intelligence A Modern Approach, third ed., Pearson Education Inc, 2010.
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献