1. Arakawa, M., Fuyuki, M., Nakanishi, H., Inoue, I., 2000. A simulation-based capacity adjustment method for job shop production scheduling. Proceedings of the Third Asia-Pacific Conference on Industrial Engineering and Management Systems (APIEMS ’2000), Hong Kong, China, pp. 84–90.
2. A simulation-based method for capacity adjustments in job shop production scheduling;Arakawa;Journal of Japan Industrial Management Association,2001
3. Single machine scheduling with shutdown to meet due times;Asano;Journal of Japan Industrial Management Association,1999
4. Theory of Scheduling;Conway,1967
5. Due-date-conformance oriented production scheduling in a make-to-order production on the basis of backward/forward hybrid simulation;Fuyuki;Journal of Japan Industrial Management Association,1995