Subject
Information Systems and Management,Management Science and Operations Research,Modelling and Simulation,General Computer Science,Industrial and Manufacturing Engineering
Reference14 articles.
1. Heuristics for scheduling projects with resource restrictions and several resource-duration modes;Boctor;International Journal of Production Research,1993
2. An adaptation of the simulated annealing algorithm for solving resource-constrained project scheduling problems;Boctor,1994
3. Practical Nonparametric Statistics;Conover,1980
4. Nonpreemptive multimode resource-constrained project scheduling;Drexl;IIE Transactions,1993
5. Activity Networks: Project Planning and Control by Network Models;Elmaghraby,1977
Cited by
86 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献