NONPREEMPTIVE MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING
Author:
Publisher
Informa UK Limited
Subject
Industrial and Manufacturing Engineering
Link
http://www.tandfonline.com/doi/pdf/10.1080/07408179308964317
Reference29 articles.
1. Resource-constrained project scheduling: an international exercise in DSS development
2. Distributed simulation of resource constrained project scheduling
3. Scheduling project networks with resource constraints and time windows
4. Design aspects of an advanced model-oriented DSS for scheduling problems in civil engineering
Cited by 95 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. On-site workshop investment problem: A novel mathematical approach and solution procedure;Heliyon;2023-12
2. Large neighborhood search for an aeronautical assembly line time-constrained scheduling problem with multiple modes and a resource leveling objective;Annals of Operations Research;2023-10-17
3. A hybrid algorithm based on non-dominated sorting ant colony and genetic algorithmsfor solving multi-objective multi-mode project scheduling problems under resource constraints;Management and Production Engineering Review;2023-07-26
4. Improved genetic algorithm based on time windows decomposition for solving resource-constrained project scheduling problem;Automation in Construction;2022-10
5. A constructive branch-and-bound algorithm for the project duration problem with partially renewable resources and general temporal constraints;Journal of Scheduling;2022-06-06
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3