Funder
CAPES
Norwegian Agency for International Cooperation and Quality Enhancement in Higher Education
Subject
Information Systems and Management,Management Science and Operations Research,Modeling and Simulation,General Computer Science,Industrial and Manufacturing Engineering
Reference56 articles.
1. Abu-Marrul, V., Martinelli, R., & Hamacher, S. (2019). Instances for the PLSV scheduling problem: An identical parallel machine approach with non-anticipatory family setup times. 10.17771/PUCRio.ResearchData.45799.
2. Scheduling pipe laying support vessels with non-anticipatory family setup times and intersections between sets of operations;Abu-Marrul;International Journal of Production Research,2020
3. Matheuristics for a parallel machine scheduling problem with non-anticipatory family setup times: Application in the offshore oil and gas industry;Abu-Marrul;Computers & Operations Research,2021
4. Scheduling identical parallel machine with unequal job release time to minimise total flow time;Ahmed;Internation Journal of Industrial and Systems Engineering,2013
5. A new dominance rule to minimize total weighted tardiness with unequal release dates;Akturk;European Journal of Operational Research,2001
Cited by
13 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献