Author:
Akturk M.Selim,Ozdemir Deniz
Subject
Information Systems and Management,Management Science and Operations Research,Modelling and Simulation,General Computer Science,Industrial and Manufacturing Engineering
Reference25 articles.
1. A new lower bounding scheme for the total weighted tardiness problem;Akturk;Computers and Operations Research,1998
2. M.S. Akturk, D. Ozdemir, New dominance properties for 1|rj|∑wjTj problem, Technical Report No. 98-30, Department of Industrial Engineering, Bilkent University, Turkey, 1998
3. Scheduling of a single machine to minimize total weighted completion time subject to release dates;Bianco;Naval Research Logistics,1982
4. A branch-and-bound algorithm to minimize total tardiness with unequal release dates;Chu;Naval Research Logistics,1992
5. A branch-and-bound algorithm to minimize total flow time with unequal release dates;Chu;Naval Research Logistics,1992
Cited by
39 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献