Author:
Allahverdi Ali,Al-Anzi Fawaz S.
Subject
Information Systems and Management,Management Science and Operations Research,Modeling and Simulation,General Computer Science,Industrial and Manufacturing Engineering
Reference28 articles.
1. Improved lower bounds for minimizing the sum of completion times of n jobs over m machines in a flowshop;Ahmadi;European Journal of Operational Research,1990
2. The relationship between three-tiered client–server internet database connectivity and two-machine flowshop;Al-Anzi;International Journal of Parallel and Distributed Systems and Networks,2001
3. Two-stage production scheduling with separated setup times and stochastic breakdowns;Allahverdi;Journal of the Operational Research Society,1995
4. Minimizing mean flowtime in a two-machine flowshop with sequence independent setup times;Allahverdi;Computers and Operations Research,2000
5. Using two-machine flowshop with maximum lateness objective to model multimedia data objects scheduling problem for WWW applications;Allahverdi;Computers and Operations Research,2002
Cited by
17 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献