Author:
Buddhakulsomsiri Jirachai,Kim David S.
Subject
Information Systems and Management,Management Science and Operations Research,Modeling and Simulation,General Computer Science,Industrial and Manufacturing Engineering
Reference23 articles.
1. Solving the multi-mode resource-constrained project scheduling problem with genetic algorithms;Alcaraz;Journal of the Operational Research Society,2003
2. Alvarez-Valdes, R., Tamarit, J.M., 1989. Heuristic algorithms for resource-constrained project scheduling: A review and an empirical analysis. In: Slowinski, R., Węglarz, J. (Eds.), Advances in Project Scheduling, pp. 113–134.
3. Some efficient multi-heuristic procedures for resource-constrained project scheduling;Boctor;European Journal of Operational Research,1990
4. Heuristics for scheduling projects with resource restrictions and several resource-duration modes;Boctor;International Journal of Production Research,1993
5. A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes;Boctor;European Journal of Operational Research,1996
Cited by
64 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献