1. TBM Tunnelling in Jointed and Faulted Rock;Barton,2000
2. Reducing risk in long deep tunnels by using TBM and Drill and Blast methods in the same project - the hybrid solution;Barton;J. Rock Mech. Geotech. Eng.,2012
3. Hybrid TBM and Drill-and-Blast from the start;Barton;Tunnell. J.,2013
4. Prediction model for performance and costs;Bruland,1998
5. Future demands and development trends;Bruland,1998