Author:
Wang Lihui,Kang Yilan,Cai Zongxi,Zhang Qian,Zhao Yu,Zhao Haifeng,Su Pengcheng
Subject
Geotechnical Engineering and Engineering Geology,Building and Construction
Reference32 articles.
1. A fuzzy logic model to predict specific energy requirement for TBM performance prediction;Acaroglu;Tunnelling and Underground Space Technology,2008
2. Stress dependency of the Cerchar abrasivity index (CAI) and its effects on wear of selected rock cutting tools;Alber;Tunnelling and Underground Space Technology,2008
3. Correlation of rock cutting tests with field performance of a TBM in a highly fractured rock formation: a case study in Kozyatagi-Kadikoy metro tunnel, Turkey;Balci;Tunnelling and Underground Space Technology,2009
4. Bruland, A., 1998. Hard Rock Tunnel Boring, Performance Data and Back-Mapping, vol. 6. University of Sciences and Technology of Trondheim (NTNU).
5. Cigla, M., Yagiz, S., Ozdemir, L. Application of Tunnel Boring Machines in Underground Mine Development[EB/OL].// (10.04.07).
Cited by
100 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献