1. Akgul, M., Yurtaydin, O., 2007. Construction, transport and assembly of a TBM selected for Kozyatagi-Kadikoy metro tunnels. In: Erdem, Y., Solak, T. (Eds.), Proceedings of the 31st ITA-AITES World Tunnel Congress, Istanbul, Balkema, Rotterdam, pp. 73–82.
2. Prediction of penetration and utilization for hard rock TBMs;Alber,1996
3. Asbury, B., Cigla, M., Balci, C., 2002. Design Methodology Testing and Evaluation of a Continuous Miner Cutterhead for Dust Reduction in Underground Coal Mining. SME Annual Meeting, Phoenix, Arizona, pp.1–8.
4. ASTM, 2005. Standard Test Method for Laboratory Determination of Pulse Velocities and Ultrasonic Elastic Constants of Rock. American Society for Testing and Materials, D 2845.
5. Balci, C., 2004. Comparison of Small Scale and Full Scale Rock Cutting Tests to Select Mechanized Excavation Machines. Doctoral Thesis. Istanbul Technical University, p. 269. (in Turkish).