1. TBM Tunnelling in Jointed and Faulted Rock;Barton,2000
2. Bruland, A., 1998. Hard Rock Tunnel Boring, Doctoral Dissertation, Norwegian University of Science and Technology, Trondheim.
3. Analysis and prediction of TBM performance in blocky rock conditions at the Lötschberg Base Tunnel;Delisio;Tunn. Undergr. Space Technol.,2013
4. A new model for TBM performance prediction in blocky rock conditions;Delisio;Tunn. Undergr. Space Technol.,2014
5. Dudt, J.-P., Descoeudres, F., Einstein, H.H., 1999. Risk assessment in design and construction of deep tunnels – example of the Gotthard base tunnel. European Conference “Deep tunnels: design, construction and service life”, Verona, Italy, pp. 50–58.