1. Hybrid genetic algorithm with simulated annealing for resource-constrained project scheduling;Bettermir;J. Constr. Eng. Mgmt., ASCE,2014
2. Chang, D.Y.-M., 1986. RESQUE: A Resource Based Simulation System for Construction Process Planning. Ph.D. Dissertation, Univ. of Michigan, Ann Arbor, Michigan.
3. Minimum moment method for resource leveling using entropy maximization;Christodoulou;J. Constr. Eng. Mgmt., ASCE,2010
4. New benchmark results for the resource-constrained project scheduling problem;Demeulemeester;Manage. Sci.,1997
5. The decision aids for tunnelling (DAT) – a brief review;Einstein;Tunnel. Technol.,2002