Integration of activity-based risk factors in PERT scheduling: case study of Indian metro tunnel projects

Author:

Shelake Abhaysinha. G.1,Gogate NIvedita G.1,Soundankar Hrishikesh S.1

Affiliation:

1. Dr. Vishwanath Karad MIT World Peace University

Abstract

Abstract In construction sector, tunneling is a costly and risky affair. The time and cost involved in tunnel construction is very high. Hence, it is necessary to use more comprehensive method like Program Evaluation Review Technique (PERT) while preparing schedule of tunnel construction projects. As PERT considers three different time durations, the reliability of the schedule prepared at planning stage of the project gets enhanced significantly. However, the schedule preparation of tunneling projects still relies mainly on the optimistic time. In this work the author attempts to prepare a PERT schedule for metro tunnel projects by integrating activity-wise risk factors. Initially, the critical risk factors are taken from previous literature and further these are mapped with tunnel construction activities. The list of construction activities along with optimistic schedule and respective activity-wise risk factor list is then supplied to tunnel experts for capturing their opinion on pessimistic and most likely time values. Finally, a comparative analysis is carried out by estimating project cost and developing a relation between the different times and costs associated with metro tunnel projects. The intent of this paper is to integrate the activity-wise risk factors in project scheduling to reduce delays and subsequent cost escalations. Integrating risk factors into PERT scheduling will improve risk management, enhance decision-making and enable realistic project planning. This will significantly improve project success rate. By considering risks in the scheduling process, project managers can effectively manage uncertainties and minimize their impact on project outcomes.

Publisher

Research Square Platform LLC

Reference34 articles.

1. Abd El-Karim, Mohamed Sayed Bassiony Ahmed, Omar Aly Mosa El Nawawy, and Ahmed Mohamed Abdel-Alim. 2017. “Identification and Assessment of Risk Factors Affecting Construction Projects.” HBRC Journal 13(2): 202–16.

2. “On the Project Risk Baseline: Integrating Aleatory Uncertainty into Project Scheduling;Acebes F;Computers and Industrial Engineering,2021

3. Project Planning And Scheduling Using PERT And CPM Techniques With Linear Programming: Case Study.”;Agyei Wallace;INTERNATIONAL JOURNAL OF SCIENTIFIC & TECHNOLOGY RESEARCH,2015

4. “Impact of Construction Delay-Controlling Parameters on Project Schedule: DEMATEL-System Dynamics Modeling Approach;Ajayi Babatunde;Frontiers in Built Environment,2022

5. Using Simulation to Plan Tunnel Construction.”;Al-Bataineh Mohammed;Journal of Construction Engineering and Management,2013

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3