1. Live insertion method to install PE mains;Ahmad;Pipe Line Ind. Houston,1989
2. A pilot study for retrospective evaluation of cured-in-place pipe (CIPP) rehabilitation of municipal gravity sewers;Allouche;Tunn. Undergr. Sp. Tech.,2014
3. Technical guide for trenchless rehabilitation engineering of urban sewer pipeline;An,2015
4. Chapman, D.N., Ng, P.C.F., Karri, R., 2007. Research needs for on-line pipe replacement techniques. Tunn. Undergr. Sp. Tech., 2007, 22(5-6), 503-514.
5. Chen, Y., et al., 2012. Application and pipe vertical displacement analysis of chemical grouting for pipe position restoration method. In: Proceedings, International Conference on Pipes and Trenchless Technology, vol. 6.