1. Allouche, E., Alam, S., Simicevic, J., Sterling, R., Condit, W., Headington, B., Matthews, J., Kampbell, E., Sangster, T., Downey, D., 2011. A Retrospective Evaluation of Cured-in-Place Pipe (CIPP) Used in Municipal Gravity Sewers, US Environmental Protection Agency, Office of Research and Development, National Risk Management Research Laboratory – Water Supply and Water Resources Division, Edison, NJ.
2. Araujo, T., Sabeshan, S., Yao, B., 2009. Factors affecting the quality of flexural properties from CIPP field samples. In: Proc. Intl. No-Dig 2009, NASTT/ISTT, Toronto, March 29–April 3.
3. Fluid migration into lined pipelines;Bakeer;Tunneling and Underground Space Technology,2005
4. Quantification of annular flow in lined pipelines;Bakeer;Tunneling and Underground Space Technology,2008
5. Bossler, B., Schlüter, M., Meyer, P., 2001. Study of the Quality of Sewer Repair Work Performed Using Hose Relining as an Example, Final Report by IKT (Institute for Underground Infrastructure), Gelsenkirchen, Germany.