1. Anderson, C., Newman, L., Roset, G., 2002. Platinum group metal bullion production and refining. In: Mular, A.L., Halbe, D.N., Barratt, D.J. (Eds.), Mineral Processing Plant Design, Practice, and Control Proceedings, Vol. 2, SME, pp. 1760–1777. https://books.google.fi/books?isbn=0873352238.
2. Brugman, C.F., Kerfoot, D.G., 1986. Treatment of nickel-copper matte at Western Platinum by the Sherritt acid leach process. In: 25th Annual Conference of Metallurgists, August 17-20, Toronto, Ontario, Canada, pp. 512–531.
3. Bryson, L.J., Hofirek, Z., Collins, M.J., Stiksma, J., Berezowsky, R.M., 2008. New matte leaching developments at Anglo Platinum’s base metal refinery. In: Young, C.A., Taylor, P.R., Anderson, C.G., Choi, Y. (Eds.), Hydrometallurgy 2008: Proceedings of the Sixth International Symposium, SME, pp. 570–579.
4. Chemical Processing, 2013. Expert forums. https://www.chemicalprocessing.com/experts/mixing/show/931/ (accessed on 20 June 2018).
5. Refining of the Platinum-Group Metals;Crundwell,2011