1. Anderson, C., Newman, L., Roset, G., 2002. Platinum Group Metal Bullion Production and Refining. Mineral Processing Plant Design, Practice, and Control Proceedings, Vol. 2, edited by Mular, A.L., Halbe, D.N., Barratt, D.J., SME, pp. 1760-1777. https://books.google.fi/books?isbn=0873352238.
2. Brugman, C.F., Kerfoot, D.G., 1986. Treatment of nickel-copper matte at Western Platinum by the Sherritt acid leach process. 25th Annual Conference of Metallurgists, August 17-20, 1986, Toronto, Ontario, Canada. pp. 512-531.
3. Bryson, L.J., Hofirek, Z., Collins, M.J., Stiksma, J., Berezowsky, R.M., 2008. New matte leaching developments at Anglo Platinum’s base metal refinery. Hydrometallurgy 2008: Proceedings of the Sixth International Symposium, edited by Young, C.A., Taylor, P.R., Anderson, C.G., Choi, Y., SME, pp. 570-579.
4. Cramer, L.A., 2008. What is your PGM concentrate worth?, in: Third international platinum conference ‘Platinum in transformation’. The Southern African Institute of Mining and Metallurgy, Johannesburg, pp. 387-394.
5. Copper leaching from primary sulfides: Options for biological and chemical extraction of copper;Dreisinger;Hydrometallurgy,2006