1. Hybrid flow-shop problems, a decomposition based heuristic approach;Aghezzaf,1995
2. Branch and bound for flow shop with multiple processors scheduling;Brah;Eur. J. of Op. Res.,1991
3. Survey of scheduling research involving due date determination decisions;Chen;Eur. J. of Op. Res.,1989
4. Production planning in the glass industry;Chevalier;Revue VERRE,1996
5. A production scheduling case study in a chemical firm using metaheuristics.;Fortemps;Eur. J. of Op. Res.,1996