Abstract
In order to solve dynamic schedule problem brought by disturbance in steelmaking, the disturbance and corresponding method are classified. Man-machine cooperated method are brought out. Gantt chart is used to help man-machine cooperating, algorithm of conflict adjusting is used to ensure validity of dynamic schedule. Based all the work above, Man-machine schedule system is built in the end.
Publisher
Trans Tech Publications, Ltd.
Reference9 articles.
1. Ozgu, M.R. Continuous caster instrumentation: state-of-the-art review. Canadian Metallurgical Quarterly. 1996, 35(3): 199- 223.
2. Vainola R.V., Holappa, L.E.K. et al. Modern steelmaking technology for special steels. Journal of Materials Processing Technology. 1995, 53(1-2): 453- 465.
3. Peter Cowling. A flexible decision support system for steel hot rolling mill scheduling. Computers and Industrial Englneeirng. 2003, 45(2), 307-321.
4. LixinTang, PeterLuh, Jiyin Liu. Steel-making process scheduling using lagrangian relaxation. International Journal of Production Research, 2002, 40(1), 5570.
5. Djama Ouelhadj. A multi-agent system for the integrated dynamic schedu1ing of steel production: (Dissertation). Nottingham: the university of Nottingham, (2003).