Author:
Wang Yankai,Wang Shilong,Yang Wenhan,Shen Chunfeng,Li Junliang
Reference37 articles.
1. Bi-objective re-entrant hybrid flow shop scheduling considering energy consumption cost under time-of-use electricity tariffs;Geng;Complexity,2020
2. An energy-efficient two-stage hybrid flow shop scheduling problem in a glass production;Wang;Int. J. Prod. Res.,2019
3. A multiobjective evolutionary algorithm based on decomposition for hybrid flowshop green scheduling problem;Zhang;Comput. Ind. Eng.,2019
4. A hybrid water flow algorithm for multi-objective flexible flow shop scheduling problems;Tran;Eng. Optim.,2012
5. An MO-GVNS algorithm for solving a multiobjective hybrid flow shop scheduling problem;Siqueira;Int. Trans. Oper. Res.,2019
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献