1. A fast heuristic for quay crane scheduling with interference constraints;Bierwirth;Journal of Scheduling,2009
2. A survey of berth allocation and quay crane scheduling problems in container terminals;Bierwirth;European Journal of Operational Research,2010
3. Chae, J.-W., Park, W.-S., Jeong, G., 2008. A hybrid quay wall proposed for a very large container ship in the west terminal of busan new port. In: International Conference on Coastal Engineering in Hamburg, Germany.
4. Chen, J.H., Lee, D.H., Cao, J.X., 2010. Quay crane scheduling for indented berth. In: 89th Transportation Research Board Annual Meeting, Washington, DC, USA.
5. Makespan minimization for scheduling unrelated parallel machines: a recovering beam search approach;Ghirardi;European Journal of Operational Research,2005