1. Campbell R, Hardy G, Merz K. Seismic fragility application guide. Final report TR-1002988, EPRI, Palo Alto; 2002.
2. Wakefield D, Ravindra M, Merz K, Hardy G. Seismic probabilistic risk assessment implementation guide. Final report 1002989, EPRI, Palo Alto; 2003.
3. Campbell R, Hardy G. Applications guide for use of seismic margin assessments in quantitative risk-informed decision making. Final report TR-1010998, EPRI, Palo Alto; 2004.
4. Probabilistic seismic safety study of an existing nuclear power plant;Kennedy;Nuclear Engineering and Design,1980
5. A methodology for seismic risk analysis of nuclear power plants;Kaplan;Risk Analysis,1983