1. All Continental Europe and Nordic TSOs’ proposal for assumptions and a Cost Benefit Analysis methodology in accordance with Article 156(11) of the Commission Regulation (EU) 2017/1485 of 2 August 2017 establishing a guideline on electricity transmission system operation. European Network of Transmission System Operators for Electricity, March 2018.
2. European Resource Adequacy Assessment - Methodology Proposal in accordance with Article 23 of the Electricity Regulation of the European Parliament and of the Council of 5 June 2019 on the internal market for electricity (recast). European Network of Transmission System Operators for Electricity, December 2019.
3. A comparison of four Monte Carlo methods for estimating the probability of s − t connectedness;Fishman;IEEE Trans Reliability,1986
4. A randomized fully polynomial time approximation scheme for the all terminal reliability problem;Karger;SIAM Rev,2001
5. Combining Monte Carlo estimates and bounds for network reliability;Nel;Networks,1990