1. Falcone D, Silvestri A, Bona G, et al (2010) Study and modelling of very flexible lines through simulation
2. Falcone D, Silvestri A, Forcina A, Pacitto A (2011) Modeling and simulation of an assembly line: a new approach for assignment and optimization of activities of operators. In: MAS (The International Conference on Modeling and Applied Simulation), Rome. pp 12–14
3. Di Bona G, Duraccio V, Silvestri A, Forcina A (2014) Productive line reengineering through simulation techniques. In: Proceedings of the IASTED International Conference on Modelling, Identification and Control. pp 291–296
4. Di Bona G, Duraccio V, Silvestri A, Forcina A (2014) Validation and application of a safety allocation technique (integrated hazard method) to an aerospace prototype. In: Proceedings of the IASTED international conference on modelling, identification, and control, MIC. pp 284–290
5. Layout and Material Flow Optimization in Digital Factory;Centobelli;International Journal of Simulation Modelling,2016