Implementation of Pre-defined Potential Scope Reductions in Projects
Author:
Publisher
Elsevier BV
Subject
General Engineering
Reference21 articles.
1. Chevroulet, T., Giorgi, L., and Reynaud, C. “New Approach for the Assessment of High-Speed Rail Projects and How to Contain Cost Overruns: Lessons from the EVA-TREN Project.”. J. Infrastruct. Syst. 2012; 18(4), 297-304.
2. How (in)accurate are demand forecasts in public works projects;Flyvbjerg;J. Am. Planning Assoc,2005
3. Different cost performance: different determinants?.: The case of cost overruns in Dutch transport infrastructure projects;Cantarelli;Transport Policy,2012
4. Concept (2015). www.concept.ntnu.no.
5. Olsson, N.O. E., & Magnussen, O.M. Flexibility at different stages in the life cycle of projects: an empirical illustration of the “freedom to maneuver”. PMJ; 2007. p. 25-32.
Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Practical Use and Effects of Scope Reductions in the Form of Reduction Lists;Advances in Business Information Systems and Analytics;2018
2. Flexible Approach for Construction Process Management Under Risk and Uncertainty;Procedia Engineering;2017
3. Scope Reductions as Tool for Cost Control in Construction Projects;Project Management
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3