1. Standard Methods for the Examination of Water and Wastewater;APHA,2012
2. Baseline, Historic and Background Rates of Deposition of Lead-rich Sediments on the Floodplain of the Coeur D’Alene River;Bookstrom,2013
3. Coeur d’Alene Reservation Five-year Synthesis, 2011 – 2015 Monitoring Data. 4(e) Condition No. 5. Spokane River Hydroelectric Project. FERC Project No. 2545;Coeur d’Alene Tribe (CDA) Tribe, Avista Corporation,2017