Subject
Industrial and Manufacturing Engineering,Management Science and Operations Research,Economics and Econometrics,General Business, Management and Accounting
Reference20 articles.
1. A self-adaptive differential evolution heuristic for two-stage assembly scheduling problem to minimize maximum lateness with setup times;Al-Anzi;European Journal of Operational Research,2007
2. Heuristics for a two-stage assembly flowshop with bicriteria of maximum lateness and makespan;Al-Anzi;Computers & Operations Research,2009
3. A review of scheduling research involving setup considerations;Allahverdi;OMEGA: The International Journal of Management Science,1999
4. A survey of scheduling problems with setup times or costs;Allahverdi;European Journal of Operational Research,2008
5. Callahan, J.R., 1971. The nothing hot delay problems in the production of steel. Ph.D. Thesis. Department of Industrial Engineering, University of Toronto, Canada.
Cited by
18 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献