Author:
Harbaoui Houda,Khalfallah Soulef
Reference27 articles.
1. A travelling salesman approach to solve the F/no-idle/Cmax problem;Saadani;European Journal of Operational Research,2005
2. Harbaoui, H., Khalfallah, S., and Bellenguez-Morineau, O. (2017, September). A case study of a hybrid flow shop with no-wait and limited idle time to minimize material waste. In 2017 IEEE 15th International Symposium on Intelligent Systems and Informatics (SISY) (pp. 000207--000212). IEEE.
3. Total flow time minimization in a flowshop sequence-dependent group scheduling problem;Salmasi;Computers and Operations Research,2010
4. A heuristic for minimizing the makespan in no-idle permutation flow shops;Kalczynski;Computers and Industrial Engineering,2005
5. Flowshop/noidle or nowait scheduling to minimize the sum of completion times;Adiri;Naval Research Logistics Quarterly,1982
Cited by
13 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献