1. Artificial neural networks;Abraham,2005
2. Stochastic mine design optimisation based on simulated annealing: pit limits, production schedules, multiple orebody scenarios and sensitivity analysis;Albor Consuegra;Min. Technol. IMM Trans. Sect. A,2009
3. An imperialist competitive algorithm for solving the production scheduling problem in open pit mine;Asl;Int. J. Min. GeoEng,2016
4. Determination of optimum cutoff grades of multiple metal deposits by using the golden section search method;Ataei;S. Afr. Inst. Min. Metall.,2003
5. Determination of open pit mining cut-off grade strategy using combination of nonlinear programming and genetic algorithm;Azimi;Arch. Min. Sci.,2011