Author:
Bozejko Wojciech,Hejducki Zdzislaw,Wodecki Mieczyslaw
Publisher
Springer Science and Business Media LLC
Subject
Mechanical Engineering,Civil and Structural Engineering
Reference23 articles.
1. Scheduling System for Repetitive Unit Construction Using Line-of-Balance Technology;Arditi,2002
2. On the theoretical properties of swap multimoves;Bożejko;Oper. Res. Lett.,2007
3. The new golf neighborhood for the flexible job shop problem;Bożejko;Procedia Comput. Sci.,2010
4. Applying metaheuristic strategies in construction projects management;Bożejko;J. Civil Eng. Manag.,2012
5. One machine scheduling problems with random due date and processing times;Bożejko;Bull. Polish Acad. Sci. Tech. Sci.,2017
Cited by
22 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献