1. Institute of Chengdou Investigation and Design of National Electrical Power, 2001. Report of selecting dam site for Jinping first stage hydropower station, 4 Engineering geological condition in Chinese, 3.
2. The stresses surrounding open-pit mine slopes. Planning open pit mines;Stacey,1971
3. Coupling of earth's endogenic and exogenic geological processes and origins on serious geological disasters;Wang;Chin. J. Eng. Geol.,2002
4. Wu, F., Qi, S., 2001. Report of numerical simulation study on mechanism of deep cracks as well as their influence to stability and deformation of the left abutment slope of Jinping first stage hydropower station (in Chinese).
5. Qualitative analysis of change in engineering behavior of slope in size similarity transformation;Wu;Chin. J. Eng. Geol.,1998