1. Solving the Single and Multiple Asymmetric Traveling Salesmen Problems by Generating Subtour Elimination Constraints from Integer Solutions;Aguayo;IISE Trans.,2017
2. Crane overlap and operational flexibility: balancing utilization, duration, and safety;Al Hattab,2017
3. Decision support system for tower crane location and material supply point in construction sites using an integer linear programming model;Amiri,2022
4. Re-optimization strategy for truck crane lift-path planning;An;Autom. Constr.,2018
5. The stacker crane problem and the directed general routing problem;Ávila;Networks,2015