Author:
Li Rongyan,Chen Junyu,Chi Hung-Lin,Wang Dong,Fu Yan
Funder
University Grants Committee Research Grants Council
Reference71 articles.
1. Integrated mathematical optimisation approach for the tower crane hook routing problem to satisfy material demand requests on-site;Hammad;Adv. Eng. Inf.,2023
2. BACIHS6 REV. 1992 (1995 - 2021). https://oec.world/en/profile/hs/tower-cranes.
3. Lin, J., Fu, Y., Li, R., & Lai, W. (2020, August). An algorithm for optimizing the location and type selection of attached tower cranes based on value engineering. In International Conference on Construction and Real Estate Management 2020 (pp. 106-117). Reston, VA: American Society of Civil Engineers. https://doi.org/10.1061/9780784483237.013.
4. Lift planning and optimization in construction: a thirty-year review;Zhang;Autom. Constr.,2020
5. Automatic tower crane layout planning system for high-rise building construction using generative adversarial network;Li;Adv. Eng. Inf.,2023