Author:
Li Xiao,Chi Hung-lin,Wu Peng,Shen Geoffrey Qiping
Funder
Hong Kong Polytechnic University
Australian Research Council
Research Institute for Sustainable Urban Development
Subject
Artificial Intelligence,Information Systems
Reference46 articles.
1. Number of Applications and Average Waiting Time for Public Rental Housing, 2019. (accessed 25 January 2019).
2. RBL-PHP: simulation of lean construction and information technologies for prefabrication housing production;Li;J. Manage. Eng.,2017
3. Investigating the determinants of the contractor’s construction and demolition waste management behavior in Mainland China;Wu;Waste Manage.,2017
4. Actual Public Housing Production in the past 10 years, 2019. (accessed 6 November 2018).
5. A model for simulating schedule risks in prefabrication housing production: a case study of six-day cycle assembly activities in Hong Kong;Li;J. Cleaner Prod.,2018
Cited by
45 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献