1. Four years of ‘factories of the future’in europe: achievements and outlook;Filos;International Journal of Computer Integrated Manufacturing,2017
2. Maximizing smart factory systems by incrementally updating point clouds;Shellshear;IEEE computer graphics and applications,2015
3. Survey on the virtual commissioning of manufacturing systems;Lee;J. Comput. Des. Eng.,2014
4. Sequence Planner team, Sequence Planner, available from https://www.github.com/kristoferB/SP (2017).
5. N. Shahim, C. Möller, Economic justification of virtual commissioning in automation industry, in: Winter Simulation Conference (WSC), 2016, IEEE, 2016, pp. 2430-2441.