1. Hybrid FlowShop: An LP based heuristic for planning level problems;Aghezzaf;ETFA Proceedings,1995
2. Aghezzaf, E. A., Artiba, A., Moursli, O., & Tahon, C. (1995). Hybrid Flowshops problems, a decomposition based heuristic approach. In International conference on industrial engineering and production managemanent (IEPM´95). FUCAM/IFIP/INRIA Proceeding, pp. 43–56.
3. A survey of scheduling problems with setup times or cost;Allahverdi;European Journal of Operational Research,2008
4. Andres, C. (2001). Programación de la Producción en Talleres de Flujo Híbrido con Tiempos de Cambio de Partida dependientes de la Secuencia. Phd dissertation, presented at Universidad Politécnica de Valencia (Spain).
5. Andres, C., Abad, R., Ros, L. & Vicens, E. (1998). A Genetic Algorithm for Production Scheduling in a two stage Hybrid flowshop with sequence dependent setup times. In 16th European conference on operation research, Belgium.