1. Report GIE 7202-02-10 Failure analysis of ethylene cracking furnace H122 tubes – Cracker 2. Dow Argentina; 2010.
2. Development of optimal decoking scheduling strategies for an industrial naphtha cracking furnace system;Lim;Ind Eng Chem Res,2006
3. Report GIE 7300-02-08 Failure analysis of furnace tubes F1002, F1004 y F1005 in CRACKER plant. Dow Chem; 2008.
4. The structure and mechanical properties of the high chromium and nickel content alloy after work in elevated temperature;Skindaras;Mechanika,2013