Project time–cost analysis under generalised precedence relations
Author:
Publisher
Elsevier BV
Subject
General Engineering,Software
Reference21 articles.
1. Linear programming solution to network compression;Perera;ASCE J Constr Div,1980
2. Scheduling project networks with resource constraints and time windows;Bartusch;Ann Oper Res,1988
3. Patterson JH, Slowinski R, Talbot FB, Weglarz, J. An algorithm for a general class of precedence and resource constrained scheduling problems. Advances in project scheduling. Amsterdam; 1989. p. 03–28.
4. Project management: engineering, technology and implementations;Shtub,1994
5. Construction time–cost trade-off analysis using LP/IP hybrid method;Liu;ASCE J Constr Eng Manage,1995
Cited by 43 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. A novel hybrid multiple objective optical microscope algorithm for fuzzy time, cost, and quality tradeoff in project management;International Journal of Construction Management;2024-09-04
2. Optimizing time and cost in construction projects with a hybridized multi-verse optimizer and opposition-based learning;Engineering, Construction and Architectural Management;2024-05-13
3. Optimizing time, cost, and carbon in construction: grasshopper algorithm empowered with tournament selection and opposition-based learning;Scientific Reports;2023-12-14
4. Tradeoff different construction project goals in using a novel multi-objective sea horse algorithm;Alexandria Engineering Journal;2023-11
5. Modified dynamic opposite learning assisted TLBO for solving Time-Cost optimization in generalized construction projects;Structures;2023-07
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3